Projects Archive - Âé¶¹ÊÓÆµ /projects/ Build boldly Fri, 20 Nov 2026 15:37:11 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.5 /wp-content/uploads/2022/01/boldt-favicon-150x150.png Projects Archive - Âé¶¹ÊÓÆµ /projects/ 32 32 Stanford Medicine Sutter Health Cancer Center /project/stanford-medicine-sutter-health-cancer-center/ Fri, 20 Nov 2026 15:36:28 +0000 /?post_type=project&p=12210 The Stanford Medicine Sutter Health Cancer Center reflects a significant commitment to expanding access to comprehensive cancer care for patients and families throughout the East Bay. Developed through a joint venture between Stanford Medicine and Sutter Health, the 167,000 SF outpatient center brings cancer prevention, diagnosis, treatment and support services together in one location on...

The post Stanford Medicine Sutter Health Cancer Center appeared first on Âé¶¹ÊÓÆµ.

]]>

The Stanford Medicine Sutter Health Cancer Center reflects a significant commitment to expanding access to comprehensive cancer care for patients and families throughout the East Bay. Developed through a joint venture between Stanford Medicine and Sutter Health, the 167,000 SF outpatient center brings cancer prevention, diagnosis, treatment and support services together in one location on the Alta Bates Summit Medical Center campus in Oakland, Calif. The facility spans five stories above ground and two stories below.

The new center includes outpatient cancer clinics, infusion, imaging, radiation oncology, ambulatory surgery, breast health, pharmacy and supportive services, creating a more connected experience for patients throughout their cancer care journey. The center also expands access to clinical research opportunities and innovative treatments through on-site clinical trials. 

Located in the heart of an active hospital campus on a highly constrained site, the project required extensive planning and coordination to maintain safe surrounding healthcare operations throughout construction. With an allowable building footprint of approximately 24,000 SF, the facility maximized nearly the entire parcel, extending close to setback lines on all four sides and requiring thoughtful management of site access, logistics and material movement. While the new cancer center did not connect directly to the OSHPD-1 hospital across the street, the facility was designed to accommodate a future bridge connection. Sustainability and resilience are also integrated into the project, with an all-electric design, daylight-driven spaces and a self-shading façade that supported both energy performance and patient comfort. 

Client

Stanford Medicine and Sutter Health

Location
Okland, California
Architect/Engineer

SmithGroup
Southland Industries
Rutherford + Chekene

Âé¶¹ÊÓÆµ Role
General Contractor
Project Type
New Construction
Project Size
167,000 SF

MARKET
Healthcare

Project Highlights

  • The 167,000 SF outpatient cancer center spans five stories above ground and two levels below.
  • The facility brings cancer clinics, infusion, imaging, radiation oncology, ambulatory surgery, breast health, pharmacy and supportive services together in one location.
  • An approximately 24,000 SF allowable building footprint required the project team to maximize a highly constrained site while maintaining surrounding healthcare operations.
  • The all-electric facility incorporates daylight-driven spaces and a self-shading façade to support energy performance and patient comfort.

The post Stanford Medicine Sutter Health Cancer Center appeared first on Âé¶¹ÊÓÆµ.

]]>
Oral & Maxillofacial Surgery Fox Cities /project/oral-maxillofacial-surgery-fox-cities/ Wed, 11 Nov 2026 19:27:55 +0000 /?post_type=project&p=12205 The oral surgery clinic provides specialized care for procedures including dental implants, bone grafting, wisdom teeth removal, orthognathic surgery and pre-prosthetic surgery. To accommodate growing patient needs and increase surgical capacity, Âé¶¹ÊÓÆµ expanded and renovated the facility with two additions, new procedure and recovery rooms, expanded staff support areas and updates to existing patient spaces. ...

The post Oral & Maxillofacial Surgery Fox Cities appeared first on Âé¶¹ÊÓÆµ.

]]>

The oral surgery clinic provides specialized care for procedures including dental implants, bone grafting, wisdom teeth removal, orthognathic surgery and pre-prosthetic surgery. To accommodate growing patient needs and increase surgical capacity, Âé¶¹ÊÓÆµ expanded and renovated the facility with two additions, new procedure and recovery rooms, expanded staff support areas and updates to existing patient spaces. 

Âé¶¹ÊÓÆµâ€™s history with the facility dates back to 2005, when the team completed construction of the original 16,423 SF clinic, which included 15 procedure rooms and 10 recovery suites. The latest work builds on that original facility while improving accessibility, supporting more efficient operations and creating additional capacity for patients and staff. 

Client

Oral & Maxillofacial Surgery Fox Cities

Location
Appleton, Wisconsin
Architect/Engineer

Gries Architectural Group

Âé¶¹ÊÓÆµ Role
Construction Manager
Project Type
New Construction / Renovation
Project Size
30,291 SF

MARKET
Healthcare

Project Highlights

  • Two additions expanded the clinic’s procedure, recovery and staff support spaces.
  • Interior renovations included new carpeting, fresh paint and updated ceilings.
  • The parking lot doubled in size to accommodate increased patient and staff volume.The facility includes a second-floor mechanical mezzanine.

The post Oral & Maxillofacial Surgery Fox Cities appeared first on Âé¶¹ÊÓÆµ.

]]>
Memorial Health System of Southwest Oklahoma – Hybrid OR Renovations /project/hybrid-operating-room-renovations-memorial-health/ Wed, 11 Nov 2026 18:59:43 +0000 /?post_type=project&p=12203 Âé¶¹ÊÓÆµ renovated existing radiology space within an active hospital to create a new hybrid operating room and supporting spaces. These included a viewing room, staff workroom, clean storage, soiled utility room, office and Uninterruptible Power Supply (UPS) room. The project also featured a new rooftop unit and UPS backup system to support the hybrid OR...

The post Memorial Health System of Southwest Oklahoma – Hybrid OR Renovations appeared first on Âé¶¹ÊÓÆµ.

]]>

Âé¶¹ÊÓÆµ renovated existing radiology space within an active hospital to create a new hybrid operating room and supporting spaces. These included a viewing room, staff workroom, clean storage, soiled utility room, office and Uninterruptible Power Supply (UPS) room. The project also featured a new rooftop unit and UPS backup system to support the hybrid OR equipment. 

Construction required extensive coordination to maintain hospital operations and patient safety. The team planned and completed an after-hours, hospital wide medical gas shutdown and installed new isolation valves for future maintenance. With only nine inches of available space above the hybrid OR ceiling, new ductwork, HEPA filtration, lighting, electrical and medical gas systems were carefully coordinated around structural supports and equipment clearances. The completed space accommodated Canon Medical Systems’ first installation of this type of hybrid OR equipment in Oklahoma. 

Client

Memorial Health System of Southwest Oklahoma

Location
Lawton, Oklahoma
Architect/Engineer

ADG Blatt Architects
PEC (MEP/Structural)

Âé¶¹ÊÓÆµ Role
Construction Manager
Project Type
Renovation
Project Size
2,500 SF

MARKET
Healthcare

Project Highlights

  • Renovated active hospital space to create a new hybrid OR and viewing room, staff workroom, clean storage, soiled utility room, office and UPS room.
  • Installed a new rooftop unit and UPS backup system to support the hybrid OR and its specialized equipment.
  • Coordinated a hospital wide medical gas shutdown after hours, including temporary medical gas supplies for critical patient needs and the installation of new isolation valves.
  • Coordinated mechanical, electrical, medical gas, lighting, HEPA filtration and structural systems within only nine inches of available above-ceiling space.

The post Memorial Health System of Southwest Oklahoma – Hybrid OR Renovations appeared first on Âé¶¹ÊÓÆµ.

]]>
Aurora Medical Center — Grafton Expansion /project/aurora-medical-center-grafton-expansion/ Tue, 03 Nov 2026 19:31:45 +0000 /?post_type=project&p=12178 The Aurora Medical Center — Grafton Expansion is an active project focused on increasing patient capacity and expanding access to emergency and specialty care. The project includes a four-story patient tower with a penthouse, 84 new private inpatient rooms, and enhancements to emergency services, women’s health, neonatal care and specialty care. Construction is taking place...

The post Aurora Medical Center — Grafton Expansion appeared first on Âé¶¹ÊÓÆµ.

]]>

The Aurora Medical Center — Grafton Expansion is an active project focused on increasing patient capacity and expanding access to emergency and specialty care. The project includes a four-story patient tower with a penthouse, 84 new private inpatient rooms, and enhancements to emergency services, women’s health, neonatal care and specialty care.

Construction is taking place adjacent to an active healthcare campus, requiring thoughtful planning and coordination to maintain hospital operations throughout construction. The project also incorporates 66 prefabricated slide-in bathroom pods to support efficient construction and installation.

Once complete, the expansion will provide additional capacity and enhanced care to support the evolving needs of patients and the surrounding community.

Client

Aurora Health Care

Location
Grafton, Wisconsin
Architect/Engineer

HGA

Âé¶¹ÊÓÆµ Role
Construction Manager
Project Type
New Construction / Renovation
Project Size
155,000 SF

MARKET
Healthcare

Project Highlights

  • Construction is occurring adjacent to an active healthcare campus, requiring coordination to maintain ongoing hospital operations.
  • The project incorporates 66 prefabricated slide-in bathroom pods.
  • The expansion will add 84 new private inpatient rooms.

The post Aurora Medical Center — Grafton Expansion appeared first on Âé¶¹ÊÓÆµ.

]]>
CommonSpirit Health — St. Joseph’s Medical Center /project/commonspirit-health-st-josephs-medical-center/ Tue, 03 Nov 2026 19:30:33 +0000 /?post_type=project&p=12180 Âé¶¹ÊÓÆµ partnered with St. Joseph’s Medical Center and Taylor Design to renovate the hospital’s pediatric services unit, transforming an aging space into a modern, family-centered environment designed for the needs of children, families and care teams. The 9,000 SF Design-Build renovation expanded the unit from nine dedicated beds to 18 while remaining within the hospital’s...

The post CommonSpirit Health — St. Joseph’s Medical Center appeared first on Âé¶¹ÊÓÆµ.

]]>

Âé¶¹ÊÓÆµ partnered with St. Joseph’s Medical Center and Taylor Design to renovate the hospital’s pediatric services unit, transforming an aging space into a modern, family-centered environment designed for the needs of children, families and care teams. The 9,000 SF Design-Build renovation expanded the unit from nine dedicated beds to 18 while remaining within the hospital’s existing third-floor footprint.

The renovation included refreshed patient rooms, a centrally located playroom and reconfigured nurse stations designed to improve visibility and access to daylight. Behind the walls, the team completed significant infrastructure improvements, including a new rooftop air-handling unit, exterior window replacement, fire and life safety upgrades, new headwall systems, expanded medical gas capabilities and centralized patient monitoring infrastructure.

Completing the renovation within an operational hospital required careful phasing and coordination to maintain continuity of care. The team used BIM coordination, Target Value Design and early collaboration with HCAI and trade partners to plan shutdowns, system tie-ins and construction activities around ongoing hospital operations. Work extending to the roof required additional coordination around the hospital’s active helipad, with a Method of Operations established with flight services and hospital staff to safely accommodate inbound aircraft while work progressed

Client

CommonSpirit Health

Location
Stockton, California
Architect/Engineer

Taylor Design

Âé¶¹ÊÓÆµ Role
General Contractor
Project Type
Renovation
Project Size
9,000 SF

MARKET
Healthcare

Project Highlights

  • Expanded pediatric care: Increased the unit from nine dedicated beds to 18 within the hospital’s existing footprint, helping St. Joseph’s Medical Center respond to increased regional demand for pediatric services.
  • Modernized care environment: Renovated patient rooms, added a centrally located playroom, reconfigured nurse stations and improved major mechanical, fire & life safety and patient-care infrastructure.
  • Construction without interrupting care: Phased construction, tightly managed shutdowns and coordinated rooftop work allowed hospital operations to continue throughout the renovation.

The post CommonSpirit Health — St. Joseph’s Medical Center appeared first on Âé¶¹ÊÓÆµ.

]]>
Saint-Gobain Renovation /project/saint-gobain-renovation/ Thu, 08 Oct 2026 13:47:29 +0000 /?post_type=project&p=12137 The Saint-Gobain Renovation project upgraded a manufacturing facility in Garden Grove, Calif., to support evolving operational needs. The work included new concrete footings, installation of a two-ton crane system and additional mechanical, electrical and plumbing infrastructure. The more than 4,500 SF renovation also included reframing for forklift access, epoxy flooring and interior finishes that improved...

The post Saint-Gobain Renovation appeared first on Âé¶¹ÊÓÆµ.

]]>

The Saint-Gobain Renovation project upgraded a manufacturing facility in Garden Grove, Calif., to support evolving operational needs. The work included new concrete footings, installation of a two-ton crane system and additional mechanical, electrical and plumbing infrastructure. The more than 4,500 SF renovation also included reframing for forklift access, epoxy flooring and interior finishes that improved the facility’s functionality and efficiency. 

The project required extensive interior demolition and reconstruction while modernizing both production and office spaces. Improvements included new overhead doors; relocated and expanded office areas; upgraded plumbing, mechanical and electrical systems; fire sprinkler integration; and new interior finishes throughout the facility. 

Client

Saint-Gobain

Location
Garden Grove, CA
Architect/Engineer

Stantec
ACCO
Rosendin

Âé¶¹ÊÓÆµ Role
General Contractor
Project Type
Renovation
Project Size
4,600 SF

Project Highlights

  • Modernized the facility through a full interior renovation that included demolition, reconstruction, drywall installation, ceiling systems and updated finishes throughout the space.Ìý
  • Improved operational efficiency with new overhead door installations, office relocations and durable epoxy flooring designed to support daily manufacturing activities.Ìý
  • Upgraded critical building systems, including plumbing, mechanical, electrical and fire sprinkler infrastructure, to meet evolving production and facility requirements.

The post Saint-Gobain Renovation appeared first on Âé¶¹ÊÓÆµ.

]]>
Sutter Health – Pacific Medical Foundation Primary Care Expansion /project/pacific-medical-foundation-primary-care-expansion/ Tue, 29 Sep 2026 21:16:13 +0000 /?post_type=project&p=12121 Âé¶¹ÊÓÆµ transformed three floors of an occupied eight-story 1970s office building into a modern ambulatory care destination for Sutter Health, strengthening access to coordinated outpatient services in San Francisco. Using a design-build delivery method with Boulder Associates, the 17,775 SF project required careful phasing to keep the building fully operational throughout construction. Working within a...

The post Sutter Health – Pacific Medical Foundation Primary Care Expansion appeared first on Âé¶¹ÊÓÆµ.

]]>

Âé¶¹ÊÓÆµ transformed three floors of an occupied eight-story 1970s office building into a modern ambulatory care destination for Sutter Health, strengthening access to coordinated outpatient services in San Francisco. Using a design-build delivery method with Boulder Associates, the 17,775 SF project required careful phasing to keep the building fully operational throughout construction.

Working within a decades-old structure, the team navigated hazardous materials abatement and unforeseen existing conditions. Laser scanning verified field conditions while robotic layout technology improved precision during framing, helping the team adapt quickly and maintain schedule confidence across all three phases.

Phase 1 delivered a 2,500 SF blood draw lab on the fourth floor featuring six draw stations, a processing lab and staff support spaces. Phase 2 converted the third floor into a 12,000 SF primary care center with 23 exam rooms, three exam-plus rooms, a procedure room and centralized reception, all designed to balance patient privacy with efficient team-based care. Phase 3 completed the transformation with a first-floor imaging department.

Client

Sutter Health

Location
San Francisco, California
Architect/Engineer

Boulder Associates

Âé¶¹ÊÓÆµ Role
General Contractor
Project Type
Expansion
Project Size
17,775 SF

MARKET
Healthcare

Project Highlights

  • A blood draw lab with six draw stations was completed on the fourth floor.
  • A 12,000 SF primary care facility was added on the third floor.
  • The first floor was transformed into a modern imaging department.

The post Sutter Health – Pacific Medical Foundation Primary Care Expansion appeared first on Âé¶¹ÊÓÆµ.

]]>
General Motors – Advanced Design Studio /project/general-motors-advanced-design-studio/ Fri, 25 Sep 2026 16:25:11 +0000 /?post_type=project&p=12116 Nestled in the Pasadena foothills, General Motors envisioned a bold new home for its Advanced Design Studio — a creative hub dedicated to exploring the future of mobility. More than a traditional automotive design center, the facility serves as an innovation laboratory where designers, sculptors and engineers imagine what personal transportation could look, feel and...

The post General Motors – Advanced Design Studio appeared first on Âé¶¹ÊÓÆµ.

]]>

Nestled in the Pasadena foothills, General Motors envisioned a bold new home for its Advanced Design Studio — a creative hub dedicated to exploring the future of mobility. More than a traditional automotive design center, the facility serves as an innovation laboratory where designers, sculptors and engineers imagine what personal transportation could look, feel and evoke 10 to 20 years from now.

Âé¶¹ÊÓÆµ transformed a vacant, aging campus into a dynamic destination where more than 100 creative professionals collaborate to envision the next generation of mobility. The design-build project reimagined 81,600 SF of warehouse space into a sophisticated design studio featuring open collaboration areas, conference rooms and support spaces, complemented by a 17,464 SF mezzanine and a 3,440 SF building addition. An industrial fabrication building houses automobile turntables, CNC machines, paint booths, modeling machines and other equipment needed to bring concepts from sketch to full-scale prototype.

Connecting both buildings is a private courtyard designed for vehicle evaluations under natural sunlight. Three rotating turntables display model vehicles from every angle in a secure setting for design reviews, events and collaboration. What started as an adaptive reuse project grew into a lasting partnership, with Âé¶¹ÊÓÆµ remaining on site beyond the initial phase to support ongoing projects and enhancements as GM continued investing in its Advanced Design Studio.

Client

General Motors

Location
Pasadena, California
Architect/Engineer

SmithGroup

Âé¶¹ÊÓÆµ Role
General Contractor
Project Type
Renovation / Addition
Project Size
127,000 SF

MARKET
Commercial
Automotive

Project Highlights

  • The project includes the construction of an innovation lab within the facility.
  • An interface design space was incorporated into the overall layout.
  • All existing equipment was relocated from the North Hollywood facility to the Pasadena location.
  • Equipment such as bed plates, milling machines and turntables was transported and reinstalled as part of the relocation.

The post General Motors – Advanced Design Studio appeared first on Âé¶¹ÊÓÆµ.

]]>
Rose State College – Health Sciences Renovation /project/rose-state-college-health-sciences-renovation/ Tue, 18 Aug 2026 12:58:40 +0000 /?post_type=project&p=12020 The Health Sciences Division at Rose State College has experienced significant growth over the past decade, creating a need for expanded facilities to support increasing enrollment and workforce development demands. To meet this need, the college completed a 54,263 SF renovation and expansion of its Health Sciences Center. Âé¶¹ÊÓÆµ lead the project and coordinated construction...

The post Rose State College – Health Sciences Renovation appeared first on Âé¶¹ÊÓÆµ.

]]>

The Health Sciences Division at Rose State College has experienced significant growth over the past decade, creating a need for expanded facilities to support increasing enrollment and workforce development demands. To meet this need, the college completed a 54,263 SF renovation and expansion of its Health Sciences Center. Âé¶¹ÊÓÆµ lead the project and coordinated construction activities to minimize disruption to ongoing campus operations and academic programs.

The project included a complete renovation of the nursing wing, featuring skills labs, simulation spaces, simulation rooms and support areas designed to meet Society for Simulation in Healthcare (SSH) standards. Additional improvements included new offices, restrooms, storage areas and technology that supports data collection and simulation-based learning. The project also delivered a new 140-seat lecture hall and renovations to four classrooms, expanding the college’s instructional capacity and enhancing the student learning experience.

Working closely with college administration, faculty and project partners, Âé¶¹ÊÓÆµ coordinated architectural, structural, mechanical, electrical and specialty trade work to meet quality, schedule and design requirements. Through proactive planning, procurement, subcontractor coordination and stakeholder communication, the project was completed ahead of schedule while maintaining a safe environment for students, faculty and staff.

Client

Rose State College

Location
Midwest City, Oklahoma
Architect/Engineer

Beck Design

Âé¶¹ÊÓÆµ Role
Construction Manager
Project Type
Addition / Renovation
Project Size
54,263 SF

MARKET
Education

Project Highlights

  • Work was performed within an active higher-education campus environment.
  • The renovation included simulation labs, classrooms, lecture halls and collaboration, and clinical spaces that will provide students with hands-on training.
  • Increased capacity will allow Rose State College to accommodate a larger student population across its health science programs.

The post Rose State College – Health Sciences Renovation appeared first on Âé¶¹ÊÓÆµ.

]]>
Lawton Community Health Center – Movie Theater Conversion /project/lawton-community-health-center-movie-theater-conversion/ Thu, 02 Jul 2026 16:55:18 +0000 /?post_type=project&p=11977 The building, originally constructed in 1994, underwent renovations to accommodate program requirements for a new medical clinic facility. The scope of work included a near‑complete interior demolition and remodel of the existing movie theater. The project included new MEP systems, fire suppression, fire alarm systems and all new finishes. The building now features a central...

The post Lawton Community Health Center – Movie Theater Conversion appeared first on Âé¶¹ÊÓÆµ.

]]>

The building, originally constructed in 1994, underwent renovations to accommodate program requirements for a new medical clinic facility. The scope of work included a near‑complete interior demolition and remodel of the existing movie theater.

The project included new MEP systems, fire suppression, fire alarm systems and all new finishes. The building now features a central waiting and reception area at the main entrance, providing seating for about 60 individuals. The facility houses an urgent care clinic, pharmacy, pediatrics department, laboratory, therapy gym, speech therapy services, counseling rooms, office space, and shipping and receiving areas.

The team added structural steel and a concrete deck to the second floor to allow for future expansion of clinic services and installed an elevator to improve accessibility.

Client

Lawton Community Health Center

Location
Lawton, Oklahoma
Architect/Engineer

SA Studio /Ìý PEC

Âé¶¹ÊÓÆµ Role
Construction Manager
Project Type
Renovation
Project Size
26,200 SF

MARKET
Healthcare

Project Highlights

  • Near-complete interior demolition of a movie theater within a surrounding retail plaza environment.
  • Renovation plans included adding a new drive‑thru pharmacy, entrance vestibule and a protective drive‑thru canopy along the front of the building.
  • The new layout included a central waiting and reception area, urgent care clinic, pharmacy, pediatrics department, laboratory, therapy gym, speech therapy, counseling rooms, office space, and shipping and receiving areas.
  • The project was partially funded through the American Rescue Plan Act.

The post Lawton Community Health Center – Movie Theater Conversion appeared first on Âé¶¹ÊÓÆµ.

]]>